A380 hangar Warehouse

area:
Architecture and Planning
place:
International Airport Frankfurt/ Main, Germany
customer:
Lufthansa Technik Logistik GmbH
period of time:
2006 - 2008
project costs:
€ 8.2 million
show images and data
description:
New A380 aircraft spare parts warehouse, comprising essentially of:
Conventional storage for pallet racks, floor pallet store including hook systems
Automated high rack warehouse
Administration wing incl. offices, recreation rooms, technical rooms, staff facilities, utility rooms and archives
Special features:
Due to the location the facade includes radar attenuation elements.
Further a CO2-fire extinguishing system was designed.

services:
General planning
Overall project management
Site supervision
Project control and compilation of documentation
Services included the compilation of basic data and constraints, conceptual design, final design, drawing up permit application documents.

A380 hangar: remodeling stores and logistics facilities, Frankfurt Airport

area:
Architecture and Planning
place:
Frankfurt Airport, Germany
customer:
Lufthansa Technik Logistik GmbH
period of time:
2012 - 2013
project costs:
€ 700.000
show images and data
description:
At the A380 hangar of Frankfurt Airport, Lufthansa Technik Logistik GmbH operates a logistics facility for spare aircraft parts.
For optimization of working practices, some rebuilding was necessary, e.g. construction of an additional double door system, extension of automated small parts store, reconfiguration of the mechanical handling equipment, and construction of a two-story office tract. This is erected within the stores and logistics facility and comprises offices and staff facility rooms with a total area of 140 m2.

Construction:    steel structure, reinforced concrete floors
Internal / external walls:  lightweight construction
services:
Layout design
Permit management 
Detail design and tendering
Site supervision for buildings, structures, HVAC + sanitation, electrical installations, fire protection

Al Aweer Gas Turbine Power Plant, Dubai

area:
Structural Engineering
place:
Al Aweer, Dubai
customer:
DEWA (Dubai Electricity & Water Authority)
period of time:
2005 - 2006
show images and data
description:
In Al Aweer, the existing power plant was extended by three new gas turbine units with a total rating of 430 MW.
This project included a number of steelwork structures, underground trafficable passages, machine foundations and reinforced concrete base slabs.
services:
Inspection and consultancy on behalf of the client in the field, acting as advisor and owner´s engineer regarding structural planning
Coordination and facilities planning

Altensteig agricultural road bridge

area:
Structural Engineering
place:
Altensteig, Germany
customer:
City of Altensteig
period of time:
2006 - 2008
project costs:
€ 300,000
show images and data
description:

A bridge for connecting agricultural roads was planned along the bypass road for the town of Altensteig. Project planning, structural engineering, tendering and site supervision were prepared.
services:
Project planning of engineering structures
Project planning of traffic installations
Structural engineering  
Tendering for civil works with bid evaluation and contract award proposal 
Site supervision 

Antenna foundations at the Array Operations Site at 5,000m a.s.l.

area:
Architecture and Planning
place:
San Pedro de Atacama, Chile
customer:
European Southern Observatory ESO
period of time:
2003 - 2009
show images and data
description:
The Atacama Large Millimeter/submillimeter Array (ALMA)
Observatory is a cooperation between Europe, East Asia,
North America and the Republic of Chile.
ALMA’s technical facilities include the antenna foundations at the Chajnantor plateau at 5,000m a.s.l. of the Array Operations Site (AOS).
Each foundation with a diameter of 8,00m has three antenna
connection points and the purpose to serve as base for the
100 tons heavy radio antennas.

services:
General planning for over 190 interconnected antenna foundations

Appraisal of damage with repair concepts for Kultur Weir, Breisach

area:
Structural Engineering
place:
Breisach, Germany
customer:
RP Freiburg, Ref. 53.3 Fichtner Water & Transportation
period of time:
2009 - 2011
project costs:
€ 2.3 million
show images and data
description:
Under an economic stimulation package of the German government, the concrete structure and crossover bridge structure of Kultur Weir at Breisach, constructed from 1962 to 1965, is to be comprehensively rehabilitated. So that the required rehabilitation services could be put out to tender, structural damage was recorded, assessed and analyzed in the course of the inspection of the structure and the concrete.
The general stability in terms of buoyancy lift, overturning and structure slip was checked on the basis of current standards.
services:
Structural inspection in accordance with DIN 1076 and the Federal German Waterways Engineering and Research Institute Code of Practice
Inspections of concrete condition
Recording, assessing and analyzing structural damage
Expert opinion with rehabilitation concept
Cost estimate
Static investigation of general structural stability in accordance with DIN 19700 and DIN 1054
Check of stability of inspection elements, i.e. stoplogs, including a check of raising the impoundment level

Appraisal of damage with repair concepts for Möhlin Weir

area:
Structural Engineering
place:
Breisach am Rhein, Germany
customer:
RP Freiburg, Ref. 53.3 Fichtner Water & Transportation
period of time:
2009 - 2010
project costs:
€ 560,000
show images and data
description:
Under an economic stimulation package of the German government, the concrete structure and crossover bridge structure of Möhlin Weir at Breisach, constructed from 1963 to 1965, is to be comprehensively rehabilitated. So that the required rehabilitation services could be put out to tender, structural damage was recorded, assessed and analyzed in the course of the inspection of the structure and the concrete.
The general stability in terms of buoyancy lift, overturning and structure slip was checked on the basis of current standards.
services:
Structural inspection in accordance with DIN 1076 and the Federal German Waterways Engineering and Research Institute Code of Practice
Inspections of concrete condition
Recording, assessing and analyzing structural damage
Expert opinion with rehabilitation concept
Cost estimate
Static investigation of general structural stability in accordance with DIN 19700 and DIN 1054
Check of stability of inspection elements, i.e. stoplogs

Berlin Brandenburg International Airport

area:
Airports
place:
Berlin, Germany
customer:
Federal Office for Building and Regional Planning, Berlin
period of time:
2009 - 2016
project costs:
~ € 50 million
show images and data
description:
On behalf of the German Ministries of Defense and Foreign Affairs as well as the Federal Chancellery, the federal government is having constructed in the north of BER facilities for receiving foreign guests of state and for accommodating the VIP squadron maintained by the Ministry of Defense. 
Fichtner has been commissioned to plan the aircraft movement area and the apron adjacent to the structures, consisting of 16 aircraft stands and associated taxilanes. The entire 250,000 m² apron is constructed in concrete and designed for accommodating aircraft up to ICAO Code Letter F, for example the Airbus A380. Also the storm water drainage facilities, including storage compartments and pumping stations as well as the configuration of the apron road network form part of the planning services. Furthermore the construction phase concept was drawn up.
services:
Compilation of basic data and constraints
Preliminary planning
Conceptual design
Cost estimate
Assistance during permit planning
Final design
Tender documents
Conducting of taxiing simulations
Investigation of jet blast impact
Development of temporary solutions during airport operation   

Bridge over the "Wilde Gutach", Community of Gutach im Breisgau

area:
Structural Engineering
place:
Gutach, Germany
customer:
Gemeinde Gutach im Breisgau / Fichtner Water & Transportation GmbH
period of time:
2012 - 2013
project costs:
€ 350,000
show images and data
description:
Along the road linking the districts of Gutach and Bleibach, a bridge over the river “Wilde Gutach” is planned together with a fish pass at the adjacent weir. 
The jointless framework structure spans approximately 22 m and is designed for road traffic together with a footpath and a cycle track. 
The total width of the bridge is 10.65 m, and in the longitudinal direction the deck slab is connected to the abutments via inclined haunches.
services:
Civil structures:  pre-project planning; conceptual engineering; detail engineering; preparation for contract award 

Structural planning:  determination of basic data and constraints; pre-project planning; conceptual engineering; preparation of permit application; detail engineering; preparation for contract award

Brigding two office blocks, Fichtner Home Office

area:
Structural Engineering
place:
Stuttgart, Germany
customer:
Fichtner GmbH & Co.KG
period of time:
2012 - 2012
project costs:
€ 170,000
show images and data
description:
The Home Office of Fichtner GmbH & Co. KG consists of two office blocks.
To shorten pedestrian routes from one block to the other, the first and second upper stories were each provided with a new bridge link.
A planning stipulation was that these had to be aesthetically attractive and unobtrusive, require only minor changes to the buildings and be quick to implement.
The result was unroofed steel structures with grid flooring and banisters of plate steel.  To provide a decorative feature in the banisters, holes were punched in the steel plates to form a pattern in the outline of a tree from the nearby Rosenstein Park.
The bridges were delivered on site ready prefabricated and they could be put in place, complete, in just one day.

services:
Project planning: determination of basic data; pre-project planning; conceptual engineering; preparation of permit application; detail engineering; preparation for and assisting in contract award; construction supervision; project control and documentation
Fichtner Bauconsulting GmbH assisted by Thomas Dehler (Freelance Architect)
Planning loadbearing structures: determination of basic data; pre-project planning; conceptual engineering; preparation of permit application; detail engineering; preparation for contract award


Business Park Heckengäu

area:
Architecture and Planning , Infrastructure and Transportation , Structural Engineering
place:
Mönsheim, Deutschland
customer:
Bertrandt AG
period of time:
2014 - 2017
project costs:
€90m
show images and data
description:
Bertrandt GmbH is expanding its operating site at the Heckengäu Business Park in Mönsheim. The resulting development campus will house 2500 employees. The structures designed for the campus comprise an office building for 750 employees and test laboratory units, an office complex for letting that can accommodate 800 employees, a restaurant with conference center, and a central energy unit for supplying the entire site including the test halls. A comprehensive infrastructure development was implemented for the overall campus using urban design methods. The landscape architectural design reflects the corporate image throughout the entire site.
services:
Complete planning services and project management.
Sectoral planning: determination of basic data; pre-project planning; conceptual engineering; permit management; detail engineering; preparation for and assisting in contract award; construction supervision for:
architectural engineering
services profile for structure
project planning of infrastructure  
structural engineering
technical installations




Centrica Glanford Brigg Biomass Power Station (CGBB)

area:
Architecture and Planning
place:
Glanford Brigg, North Lincolnshire, Great Britain
customer:
Centrica Energy
period of time:
2012 - 2012
show images and data
description:
Centrica  Brigg  Limited  (CBL)  is  proposing  to  develop  a  biomass  plant  on land adjacent to the existing Glanford Brigg power station at Scawby Brook, Brigg, North Lincolnshire.
The project is hereafter referred to as the Centrica Glanford Brigg Biomass power station (CGBB power station).
The proposed CGBB power station would use proven technology to generate up to 153MW gross and up to 137MW net of electricity that would be supplied to the grid.

services:
FEED Study:
Architectural Design
Landscape Design
Civil/ Infrastructural Design
Structural Design and Analysis
HVAC Design


Coal fired power plant in Wilhelmshaven

area:
Architecture and Planning , Infrastructure and Transportation , Structural Engineering
place:
Wilhelmshaven, Germany
customer:
Tractebel Engineering / GDF Suez / Fichtner GmbH & Co. KG
period of time:
2007 - 2013
project costs:
€ 1.6 billion
show images and data
description:
A new power plant, constructed on the North Sea ports-area in Wilhelmshaven. Civil and building construction works consist of site infrastructure, deep foundations, concrete and steel building power Block and emission control structures, Cooling water intake and outfall facilities. Further works extend the power block buildings to the material storage silos, water treatment and administration buildings.
The works are subject to specific and demanding site logistics and shall achieve a high quality architectural finish.
 

services:
Fichtner Bauconsulting is responsible for design, permit design, detail engineering, construction tender documentation, award of contract and the follow up to the turnkey , civil structure engineering, civil and building construction works providing Contract Management along with Engineering, Procurement and Construction Management (EPCM) services.


Coal Fired Power Plant Rotterdam

area:
Architecture and Planning
place:
Rotterdam, The Netherlands
customer:
Tractebel Engineering GDF Suez Fichtner GmbH & Co. KG
period of time:
2007 - 2010
project costs:
€ 1 billion
show images and data
description:
A new power plant, constructed on the Massvlakte peninsula in the Rotterdam Europort complex. 
Civil and building construction works consist of site infrastructure, deep foundations, concrete and steel building power block and emission control structures, Cooling water intake and outfall facilities. Further works extend the power block buildings to the material storage silos, water treatment and administration buildings.  
The works are subject to specific and demanding site logistics and shall achieve a high quality architectural finish.

services:
Fichtner Bauconsulting is responsible for construction tender documentation, award of contract and the follow up of the turnkey civil and building construction works providing Contract Management along with Engineering, Procurement and Construction Management (EPCM) services.


Construction of a New Office Building

area:
Architecture and Planning , Structural Engineering
place:
Munich,
customer:
Niedermair & Reich GmbH & Co. Vermietungs KG
period of time:
2015 - 2017
project costs:
€ 8.3 million
show images and data
description:
Niedermair & Reich GmbH is planning an office building with Bertrandt AG to accommodate about 310 staff. It is located in a prominent position in the heart of the “Euroindustriepark” industrial estate in Munich. This four-storey structure has a recessed stepped storey and is positioned at the northern boundary of the property in order to incorporate existing urban planning lines into its design. The building integrates smoothly into its surroundings on account of its cubature, creating architectural highlights with its modern design and dynamically offset ribbon windows. The office spaces with defined zones and privacy areas are designed as open and flexible floor plans.

services:
Complete planning and project management; Sectoral planning according to HOAI service phases 1 to 8 for the performance profiles:
§ 34 Project planning
§ 47 Transportation facilities 
§ 51 Load-bearing structures
§ 55 Technical Services
Building physics


Construction of new road connecting Plant 4 to Plant 5, with rail overpass, Porsche AG Stuttgart

area:
Infrastructure and Transportation
place:
Stuttgart, Germany
customer:
Porsche AG
period of time:
2012 - 2016
project costs:
€ 2,3 million
show images and data
description:
A rail overpass is to be constructed for the road connecting Plant 4 to Plant 5 at the company’s Zuffenhausen headquarters in Stuttgart. The length of this road is around 300 m. Together with this measure, connecting lines for the site services infrastructure are to be installed on each side of the rail line.
After its construction in a sideways orientation, the structural framework is shifted into its final location during the weekend when there is no traffic. The clearance width of the structure is 9.25 m.  

services:
Feasibility study
Project steering for the phases preparation, planning, detail engineering, and realization
Consultations and coordination with organizations participating in technical planning, including the German rail company DB AG 
Quality management
Budgetary control and expediting

DAIMLER India Commercial Vehicle, Truck Plant

area:
Architecture and Planning
place:
Chennai, India
customer:
Daimler AG
period of time:
2011 - 2012
show images and data
description:
With the construction of a truck plant in Chennai in Tamil Nadu, Daimler wants to enter the Indian commercial vehicle market.
The project consists of 150,000 m2 covered areas including Production Halls, Warehouses, a Development Hall, an Administration Building, a Training Centre, a Canteen and a Test Track.
The plant can produce up to 70,000 trucks per year. 

services:
Provided on site quality management for the Administration Building, The Development Hall, the Canteen and the Training Centre.
Support of the quality management teams for the production halls. The scope includes among others: analysis of planning and construction documents, review of technical specifications and verification and assurance of construction quality.
It includes further consultation in relation to: standards and their implementation, as well as efficient and practical building solutions.
Training of local quality management teams and site managers.

Description of structural condition, AREKO North

area:
Structural Engineering
place:
Sinzheim, Deutschland
customer:
RP Karlsruhe, Referat 53.2, Abt. Landesbetrieb Gewässer Hyder Voigt - Ingenieure Karlsruhe
period of time:
2007 - 2011
show images and data
description:
A field survey of various bridge structures with updating of structure files was conducted. Rehabilitation concepts were worked out with oversight of necessary measures.
Among others, an arch bridge and a slab bridge were completely rehabilitated.
services:
Field survey of structural damage
Planning repairs and rehabilitation
Project planning for engineering structures
Floating of tenders with contract award
Site supervision with preparation of accounts

Diagnostic Center DZ10, interior construction, Vienna

area:
Architecture and Planning
place:
Vienna, Austria
customer:
Diagnosezentrum 10
period of time:
2014 - 2015
project costs:
€ 2.9 million
show images and data
description:
In the new headquarters of the Austrian Federal Railways at Vienna Main Station, two doctors have taken out a lease on premises of 1600 m2. Here a diagnosis center for examinations – x‑ray, mammography, osteodensitometry, ultrasonic, MRT and CT – is being constructed.
The entire interior construction has a very modern design and is state-of-the-art.
services:
Planning
Tendering
General site management
Civil site Management


Dresden International Airport Refurbishment of runway

area:
Airports
place:
Dresden, Germany
customer:
Flughafen Dresden GmbH
period of time:
2003 - 2008
project costs:
€ 37 million
show images and data
description:
Dresden Airport identified the necessity for refurbishing its existing runway 04/22. Different options were investigated. Finally it was decided to construct a new and extended take-off and landing runway system to replace the existing runway.  The new 2850 m long and 60 m wide runway of concrete construction was placed immediately adjacent to the original runway, which was then demolished. This project also included the adaptation of taxiways, perimeter road and other site roads, airport security fence, storm water drainage, cable conduit system, airfield lighting, installations, signage, Navaids and meteorological installations.
The construction works were predominantly carried out at night-time during interruption of flight operation. During the day flight operation could be maintained.

services:
Determination of basic data and constraints
Investigation of rehabilitation options 
Preliminary Planning, permit planning 
All technical planning
Cost estimate
Tender documents
Floating of tenders with contract award
Investigation of obstacles 
Planning of construction logistics 
Scheduling and capacity analyses 


Energy Efficiency Programm in Public Buildings

area:
Architecture and Planning
place:
Podgorica, Montenegro
customer:
Ministry of Economy / Financing KfW Bank
period of time:
2012 - 2014
project costs:
€ 11 million
show images and data
description:
The Ministry of Economy of Montenegro is improving the Energy Efficiency in public buildings across the country. A total of 40 school buildings, including dormitories and playschools have to be assessed by walkthrough audits (WTA), and a shortlist of 30 is drawn up and ranked accordingly. These are the subject of detailed energy audits (DEA). Based on the measures suggested, a design is prepared and clusters of five schools published to international tender on a turnkey basis. Fichtner evaluates the tenders and supervises the construction works. Upon completion of construction, a verification audit will be carried out to confirm attainment of the target of 20% energy savings.

services:
All services are performed locally. 
Detailed Energy Audit performance
Definition of required measures
Design
Tender documents for turnkey contractors
Evaluation of bids
Supervision of construction works
Verification of the measures


Extension of pit for foundry sand regeneration equipment

area:
Structural Engineering
place:
Augsburg, Germany
customer:
-
period of time:
2011 - 2012
project costs:
€ 105,000
show images and data
description:
In the foundry in the plant, the sand regeneration equipment is to be changed out. The new equipment is to be set up as a mechanical structure within a deep reinforced concrete pit. To raise plant capacity, enlargement of an existing trench that is impervious to water ingress is planned. A stipulation for planning and execution is that construction must be done during the restricted plant outage time for major inspection and overhaul. Because the water table is near the ground surface and space within the foundry is very restricted, it was necessary to closely collaborate with other specialist planners for implementation, so a detailed construction schedule had to be drawn up.

services:
Preliminary planning
basic engineering
permit management
detail engineering
preparation of contract award for engineering structures and for structural planning


Extension of water treatment for Schwandorf local authorities association for Waste resources recovery

area:
Structural Engineering
place:
Schwandorf, Germany
customer:
ZV Müllverwertung Schwandorf Fichtner Water & Transportation
period of time:
2010 - 2012
project costs:
€ 750.000
show images and data
description:
Alongside power generation with grid feed-in also steam is supplied to the neighbouring NABALTEC company from the association's refuse incinerator with thermal recovery. This company has given notice of a raised steam demand over the medium term, so extension of the condensate polishing plant is necessary. 
For this purpose, an additional steel structure is to be erected with no structurally relevant connection to the existing buildings and with foundations, comprising a floor slab with foundation beams.

For this expansion, the association reckons with costs of around €750,000 net, of which €500,000 is for equipment and €250,000 for construction.
services:
For the building and structural planning:
collection of basic data with preliminary and final design, permit applications, detail design, preparation for and assisting contract award, and project supervision 



Fasanenhof link to light urban rail network

area:
Infrastructure and Transportation
place:
Stuttgart , Germany
customer:
Landeshauptstadt Stuttgart und Stuttgarter Straßenbahnen AG
period of time:
2003 - 2010
project costs:
€ 80 million
show images and data
description:
For linking the district of Fasanenhof to the city light urban rail network, a 1,400 m long tunnel with ramps is needed. Four stops are planned. Extensive relocation of utility mains are required. Following construction of the tunnel, road, track and path connections must be reinstated. 
services:
Determination of basic data and constraints
Preliminary planning
Conceptual engineering
Drawing up an application under legislation for financing communal transport
Compiling documentation for project approval by the authorities
Detail engineering
Preparation of contract award
Assistance during contract negotiations
General project management
Site supervision
Site health and safety coordination


Frankfurt-Hahn Airport Plan approval for south passenger apron

area:
Airports
place:
Frankfurt, Germany
customer:
Flughafen Frankfurt-Hahn GmbH/ Söllner Consult GmbH
period of time:
2006 - 2007
project costs:
€ 45 million
show images and data
description:
The management of Frankfurt-Hahn Airport is planning, in the context of infrastructure expansion to meet requirements, construction of a new passenger apron in the south area of the airport. On the one hand, this will segregate the passenger and air freight areas and, on the other, will take account of increasing passenger numbers.
The south passenger apron comprises, in addition to aircraft stands and taxilanes, a taxiing bridge, a service road bridge as well as connections to the parallel taxiway system for the runway 03/21. Also, to the northeast of the apron, a new maintenance area for Ryanair is to be created and a taxiing connection to Apron 2 constructed.
services:
Technical planning of stormwater drainage for application for plan approval
Sewer network calculation 
Simulation of sewage load 

Technical data
Passenger apron: total area: 26 ha, 30 aircraft stands code letter C
Maintenance apron:
area: 3.1 ha 


Fujairah International Airport Feasibility Study

area:
Airports
place:
Fujairah, UAE
customer:
Internationaler Flughafen Fujairah
period of time:
2009 -
project costs:
k. A.
show images and data
description:
Fujairah International Airport (FJA) is to undergo significant renovation during the next decade to serve a growing number of passengers. 
Due to the poor condition of the flexible pavement of the runway 11/29, the Airport Administration intends to renew the topmost asphalt layers. Additionally, it intends to widen the runway to 60m, in order to accommodate aircraft of ICAO code letter F. The runway is also to be extended to the southeast. The scope of runway extension mainly depends on a future external road crossing the western airport site or even the existing runway. 
Airport data 2007:    Passengers: 37,000 PAX/a
                                 Aircraft movements: 12,000/a
                                 Freight: 32,000 t/a
services:
Preparation of a conceptual feasibility study
Development and presentation of three alternatives for the rehabilitation and extension of the present runway
The study includes a proposed parallel temporary taxiway which can be part of the future airport development.. 
The study reflects that all construction works shall be done under full airport operation.


General Aviation Center - VIP Terminal - Vienna Airport

area:
Airports
place:
Vienna, Austria
customer:
Airport Wien AG
period of time:
2005 - 2007
project costs:
€ 13 million
show images and data
description:
In connection with expansion of Vienna Airport, a new General Aviation Terminal and a hangar are needed. The complete structure
(BT 1-5) is planned as a linear building at the boundary of the hangar apron.
services:
Site supervision (coordination of contractors , quality and budgetary control, expediting , reporting,  documentation, acceptances,  hand-over)
Construction site coordination
(ensuring compliance with health and safety legislation , optimization of deployment of protection and construction equipment resources)

Groundwater trough beneath Autobahn A5

area:
Structural Engineering
place:
Rastatt, Germany
customer:
Ed.Züblin AG
period of time:
2013 - 2014
project costs:
€ 9 million
show images and data
description:
A groundwater trough for the new rail line is to be built at the autobahn underpass for Construction Section 2. This structure forms part of the general "Rastatt Tunnel" scheme. Its overall length is 675 m. Permit calculations and detail planning are prepared for the concrete trough, including siphon and without temporary works.

services:
Structural Engineering
Documentation


Guayaquil International Airport Concession Process

area:
Airports
place:
Guayaquil, Ecuador
customer:
Autoridad Aeroporturia de Guayaquil (AAG)
period of time:
2002 - 2003
project costs:
€ 2.5 million
show images and data
description:
Guayaquil International Airport (GYE) was planned to be privatized by award of concession. The privatization process comprised the following phases:
Phase 1:   Evaluation of existing conditions for Simon Bolivar Airport
                 and assignment of upgrading the airport master plan for the
                 future Daular Airport with regard to technical, ecological, 
                 legal and economical aspects.
Phase 2:   Preparation for the privatization process.
Phase 3:   Implementation of privatization and award of concession
Traffic data 2001:  Passengers: 1.7 million PAX/a
                             Aircraft movements: 50.000/a              
                            Freight: 42.000 t/a 
services:
Procurement of basic data and site inspection of the existing Simon Bolivar Airport
Compilation of technical and ecological evaluations of the existing conditions for Simon Bolivar Airport
Advisory services for various scenarios for the development of Simon Bolivar Airport
Provision of the technical, ecological and economical part of the master plan for the new Daular Airport 

Services were rendered as member of a consortium.

Hydropower Plant Lai Châu

area:
Architecture and Planning
place:
Lai Châu, Vietnam
customer:
Fichtner GmbH & Co. KG
period of time:
2014 -
project costs:
-
show images and data
description:
In the context of a financial cooperation, the Federal Republic of Germany is supporting a project to finance the grid connection of the hydroelectric power plant (HPP) Lai Châu on the Black River (Song Da) in northern Vietnam. For this purpose a 160 km long 500 kV high-voltage transmission line from Lai Châu t to Son La is built. The switchgear in Son La is expanded accordingly. The HPP Lai Châu (1,200 MW) is under construction and being connected to the Vietnamese grid to supply load centers mainly in the north and center of the country.
The construction of the hydroelectric plant Lai Châu is particularly considered an associated project in relation to environmental and social aspects. In addition to the expansion of the switchgear, a second component of the project is to ensuring the environmental and social compatibility of the construction and operation of HPP Lai Châu, including the network connection.
services:
Architectural concepts, allocation of functions, interior design including the control room in respect to Vietnamese construction technics and local available materials.
Concept development for facades, interior designs and landscaping including land restauration of the left and right banks. Implementation of the architecture and interior design for the main buildings and adjacent technical buildings. Implementation of the landscaping concept. Workshops held in Vietnam with local architects and engineers. Presentation of the final concepts to representatives of the Vietnamese energy authorities EVN.

Infrastructure development for the A 380 Frankfurt International Airport

area:
Airports
place:
Frankfurt / Main, Germany
customer:
Deutsche Lufthansa AG
period of time:
2004 - 2008
project costs:
€ 10.4 million
show images and data
description:
Due to the procurement of the new aircraft type Airbus A380 Lufthansa Technik decided to construct a new maintenance hangar for the A380 at Frankfurt International Airport. Additional to the maintenance hangar the internal site development covers the adjacent 74,000 m² apron, including 400 Hz electricity supply for three aircraft stands, area lighting and other external facilities, with roads, parking lots and storage areas, covering a total of 30,000 m². Also projected are central utility services networks for storm water drainage consisting of three sub-networks, sewage, drinking and service water, a local heating plant as well as a cable duct network. Furthermore the project includes a service connection to a warehouse, a security building with gates and barriers as well as perimeter fencing around the entire site.
services:
Determination of basic data and constraints
General planning on the basis of officially approved plans for all infrastructure facilities, the central utility services, the apron, the warehouse and the security building
Cost estimate
Tender documents 
General construction management and site supervision
Project management 

Infrastructure planning at the Mönsheim site

area:
Infrastructure and Transportation , Technical Building Services
place:
Mönsheim, Deutschland
customer:
Bertrandt AG
period of time:
2014 - 2016
project costs:
€12.5 million
show images and data
description:
In connection with location development, various systems for heat and cold generation are investigated and assessed under the aspect of their life cycle costs. The result is a group heating and cooling network with heating and cooling capacities of respectively 3.8 MW and 3.5 MW.  This power requirement is met by two 500 kWt packaged CHP units and two 1500 kW woodchip-fired boilers. Two absorption refrigeration units generate the cooling baseload from the CHP units' output power. Two additional compression refrigeration machines meet the balance of the cooling demand at peak load times. To avert failure of the IT installations, two mutually independent server rooms are installed, linked in a star configuration with the buildings.


services:
Complete planning services and project management, feasibility study
Sectoral planning: determination of basic data; pre-project planning; conceptual engineering; permit management; detail engineering; preparation for and assisting in contract award; and construction supervision for:
services profile for structure
project planning of engineering structures
project planning of traffic installations  
structural engineering
technical installations


Investigation of structures at the P5 rocket engine test bed, Hardthausen-Lampoldshausen

area:
Structural Engineering
place:
Hardthausen-Lampoldshausen, Germany
customer:
DLR - Deutsches Zentrum für Luft- und Raumfahrt e.V.
period of time:
2012 - 2014
project costs:
k.A.
show images and data
description:

In connection with conceptual engineering of the Ariane rocket engine test bed of the German Aerospace Centre at its Lampoldshausen site, an investigation was conducted into the impact of a rocket fuel explosion within the projected test bed structure on existing test bed structures in the immediate vicinity. The anticipated pressure loadings were derived from a 3-D explosion simulation.
services:
Appraisal of situation
Proof of structural stability and evaluation of existing structure under the new loading situation 
Working out necessary compensatory measures

Kunstmuseum Stuttgart

area:
Structural Engineering
place:
Stuttgart, Germany
customer:
City of Stuttgart
period of time:
2000 - 2007
project costs:
€ 67 million
show images and data
description:
Within the urban remodelling of one of Stuttgarts most important place „Kleiner Schlossplatz“ in the city centre, FBC was responsible for the structural design of the necessary foundation works and the basement structures.
Due to the existing structures within the construction site, mainly the basement of the New Arts-Museum, a road tunnel and the buildings under preservations order in the neighbourhood, the design of the new structures and foundations, the construction pit and the construction progress itself was to be planned in detail and with focus on the infrastructural impact during the construction time.

services:
Structural design
Preliminary design and building permission design
Design of the construction pit


Linz State Neuropsychiatric Clinic: refurbishment of historic building

area:
Architecture and Planning
place:
Linz, Austria
customer:
Oberösterreichische Gesundheits- und Spitals-AG (GESPAG)
period of time:
2004 - 2016
project costs:
€ 86 million
show images and data
description:
After completing a new structure at the clinic, in 2004 a start was made with refurbishment of the historic building. It was connected to the new structure by an underground collector system that serves as a supply traffic link.
Because the original building continued in full operation, it could only be refurbished in stages, so one building section would be fully renovated and reoccupied before making a start on the next one.
The building, that is under a preservation order, was completely gutted and its interior rebuilt, in line with present-day space needs and technical requirements.
Wards:
Forensic Medicine for men and women
Gerontological Psychiatry, Wards 3/4
Acute Treatment for Addiction to Illegal Drugs
Geriatric Day Clinic / Outpatients
Department for Addiction Treatment, Day Clinic and Outpatients
Psychiatric Day Clinic and Outpatients
Mühlviertel Psychiatric Ward
Adolescent Psychiatric Wards, Day Clinic and Outpatients
services:
General site management
Civil site Management


Network connection of Offshore Wind parks

area:
Architecture and Planning
place:
Heede/ Emsland, Germany
customer:
TenneT TSO GmbH
period of time:
2010 - 2014
project costs:
€ 2.4 billion
show images and data
description:
As part of the energy revolution “Energiewende” various contracts for the construction of electricity network connections in the German North Sea have been tendered Europe wide. The construction of the connections is by turnkey contractors. The wind park clusters to be connected are BorWin, DolWin, HelWin and Sylwin.
The aim of the projects is to connect the energy generated by the offshore wind parks to the existing land based High Voltage distribution network. A network connection consists of an Offshore Convertor Platform housing a high voltage AC to DC electricity convertor station. The output of the platform is through a High Voltage DC cable at +/- 320kV connecting to a further land based Convertor Station up to 200km away. The land based convertor station converts the incoming DC voltage back to AC and makes the connection to feed the land based High Voltage distribution system. 
Project control activities and along with engineering services are undertaken by a consortium headed up by Fichtner GmbH.
services:
Planning oversight and site supervision with quality control, safety checks and expediting
Assistance to client during permit application procedures, with follow-up
Support for public functions
Negotiations on supplements to general contractor agreements
Matters relating to property

On-site support and engineering consultancy to COBRA within the CCPP Project Bremen

area:
Structural Engineering
place:
Bremen, Germany
customer:
COBRA
period of time:
2012 - 2013
project costs:
€ 450 million
show images and data
description:
The Gemeinschaftskraftwerk Bremen GmbH is erecting a 440 MW CCPP at the Bremen site. The EPC contractor is a consortium of GE and Cobra Instalaciones y Servicios S.A. (in the following COBRA). GE is in the lead position of the consortium and delivers the main components. Cobra is responsible for the engineering for the erection of the power plant. In order to support COBRA in Bremen and to accelerate the local processes Fichtner has been asked for experts supporting COBRA on-site. The experts shall mainly be of the disciplines civil works, mechanical and electrical engineering and shall have experience with German regulations, standards, etc..Due to the fact that civil engineering shall be a major part of the work within the Fichtner Group, Fichtner Bauconsulting GmbH, Stuttgart,  will act as the first contact partner.
services:
Consultancy and Co-ordination

Operation Support Facility (OSF) of the ALMA Observatory, Chile

area:
Architecture and Planning
place:
San Pedro de Atacama, Chile
customer:
European Southern Observatory ESO)
period of time:
2003 - 2009
project costs:
€ 20 million
show images and data
description:
The Atacama Large Millimeter/sub millimeter Array (ALMA) 
Observatory is a cooperation between Europe, East Asia, 
North America and the Republic of Chile. 
ALMA’s technical facilities such as the Operation Support Facility (OSF) are located at 2.900m.a.s.l and include the Control room, the Administrative areas, Laboratories, Workshops, Maintenance areas for the antennas including special antenna foundations
and a Warehouse of 30 x 80m. 
Further a large external traffic area was planned to assure 
the proper maneuvering of the specially designed antenna 
transporters.
services:
General planning including Conceptual design, Preliminary design, Layout planning, Permitting documentation, Tender documentation, 
Cost evaluation, Site supervision, 
Project management, Final documentation. 
The buildings are equipped with fire protection and detection systems, information and communication technology, CCTV surveillance including access control and alarm systems. 
The use of water, the treatment of sewerage and the landscaping required special attention in this desert location.

Outdoor test bench for gas turbines and compressors

area:
Architecture and Planning , Infrastructure and Transportation , Structural Engineering
place:
Oberhausen, Germany
customer:
-
period of time:
2011 - 2012
project costs:
€ 5 million
show images and data
description:
Planning of a further test bench for trial runs of gas turbines and gas turbine-compressor units throughout the year. The test bench to be constructed is designed to accommodate a maximum of three gas turbine test bays. Trials are to be conducted of two gas turbine classes. Due to the presence of flammable gases, for safety reasons trials of gas turbine-driven compressors are not permitted in the existing enclosed test bench structures so they have to be conducted in the open at a new test bench.
Fichtner Bauconsulting undertakes complete planning services, covering civil engineering, operating media supply, process engineering, electrical installations and I&C systems.


services:
Planning of buildings and installations plus structural planning
Media supply and exhaust system, including process and system planning
Planning of electrical and I&C systems
Project steering and coordination of general contractor
General services for engineering structures
General services for traffic infrastructure
General services for structural planning
General services for technical installations


Permanent Roads for the Hydro-Power Plant, Bujagali, Uganda

area:
Infrastructure and Transportation
place:
Bujagali, Uganda
customer:
Fichtner GmbH & Co. KG
period of time:
2008 - 2011
show images and data
description:
The projected access road to the planned Bujagali Hydroelectric Power Project is intended to link up with the existing traffic connection between Jinja and Kayunga. The total length of the road is 2.3 km. All intersections are planned with a three-section arc sequence with radiuses, R1/R2/R3, of 34/17/51 m. The radius at the west side of the junction to the switchyard is planned with a radius, R of 15 m.

The road is to be drained by drainage ditches running parallel to it and cross drains (culvert) where required.
services:
Design and Engineering works in accordance with local standards incl.:
Road design and engineering
Road shop drawings
Drainage design 
Structural design for the service tunnel

Power and Desalination Plant

area:
Architecture and Planning
place:
Ras Al Khair, Saudi Arabia
customer:
Pöyry Energy AG ACC & SEPCOIII Consortium
period of time:
2011 - 2013
show images and data
description:
For the power plant part of Phase 1 of the Ras Al Khair Power and Desalination Plant Project, Fichtner has full responsibility for planning, with conceptual and detailed engineering, tendering by lots and interface management for the general contractor.

This combined cycle power plant has a net electrical power output of 2400 MW.


services:
Detail planning

Relocation of Waste Collection Yard

area:
Architecture and Planning
place:
Augsburg, Germany
customer:
period of time:
2013 - 2013
project costs:
€ 1.05 million
show images and data
description:

Wastes are generated during production but also in the administration departments and these are collected on the company premises for transfer. 
The waste collection yard in use up to now is to be put to another use and will be built over, so the waste drop-off and transfer point have to be relocated. For the concept study, the feasibility of various layout and utilization options as a greenfield solution was investigated under consideration of costs. This study now provides the basis for layout planning.


services:
Concept study
Determination of feasibility
Layout planning
Design Report


Remodeling and modernization of a residential building Adlerstraße, Stuttgart

area:
Structural Engineering
place:
Stuttgart, Germany
customer:
Bau- und WohnungsVerein Stuttgart
period of time:
2012 - 2013
project costs:
€ 1.34 million
show images and data
description:
The residential building Adlerstr. 17 / Möhringerstr. 23 is being completely modernized and remodeled so its structural stability and also the redimensioning, e.g. of the new roof structure and the balconies, had to be checked.
Technical oversight of the rehabilitation work was provided throughout the construction period.
services:
Structural survey
Proof of stability of the existing structural components – roof, framed walls, wood beam floors – under the new loading conditions with elaboration of required rehabilitation measures
Proof of stability of new structures

Revitalization of “Gründerzeit” ensemble, Vienna

area:
Architecture and Planning
place:
Vienna, Austria
customer:
ÖBB Immobilien
period of time:
2007 - 2012
project costs:
€ 23 million
show images and data
description:
Revitalization of a building ensemble from the 1870s German-Austrian neo-renaissance, 1st Viennese District
The building of landmark status designed by the architects Romano and Schwendenwein is located at Getreidemarkt, near the Museums Quarter.
Renovation is state of the art and the interior architecture is brought up to a standard matching its inner-city location. The building is being fully refurbished and also extended by fitting out two attic stories.
A key aspect is to accentuate parts of the building of particular historical significance, like representative foyers and stairwells with attractive panorama elevators and adjacent reception zones, and to install internal light shafts in the centers of leased units.
Created within the existing building substance are modern, open, flexible structures and functional areas. The focus is not on the technology, but rather on the enclosed space and atmosphere that is created, firstly by the emphasis placed on historical structural elements and, secondly, by the use of high quality materials.

services:
General site management
Civil site Management


Rhine Port Steam Power Plant, Unit 8, Karlsruhe

area:
Architecture and Planning , Infrastructure and Transportation , Structural Engineering
place:
Karlsruhe, Germany
customer:
EnBW AG Fichtner GmbH & Co. KG
period of time:
2007 - 2014
project costs:
€ 1.3 billion
show images and data
description:
Energie Baden-Württemberg AG (EnBW) constructs the power block unit 8 as an extension of the existing  coal-fired plant in Karlsruhe at the Rhine Port Steam Turbine Power Plant.
This unit is designed as a 912 MWel coal-fired power block with district heating extraction. Essential elements of the new plant project are the turbine building attached to the boiler house and the main switchgear building, as well as the entire flue gas cleaning tract and the coal handling facilities.
Integrated part beside the main construction of the new structures is the complete new infrastructure with rails, roads, media channels, drainage system, gates and fences as well as other external facilities.

services:
Full range of services for project engineering, structural analysis, detailed architectural and structural engineering for steel structures and reinforced concrete constructions, roof and facade constructions, traffic systems, buried pipe systems and technical building services, comprising:
Compilation of basic data and constraints, conceptual design, final design, permit management, detail engineering, specifications for all civil works, preparation for and assisting in contract award, construction supervision, project tracking and compilation of documentation.

Sanierung einer Villa

area:
Architecture and Planning
place:
Linz, Austria
customer:
private
period of time:
2013 - 2014
project costs:
€ 900,000
show images and data
description:
The villa, that is subject to a preservation order, was renovated throughout.
All services lines and connections, floors and in some cases walls were changed out.
An unused indoor swimming pool was converted into living space.
services:
Gesamtbauleitung
Fachbauleitung Bau

SIEMENS Mega Test Centre

area:
Architecture and Planning , Structural Engineering
place:
Duisburg, Germany
customer:
Siemens AG
period of time:
2006 - 2009
project costs:
€ 116 million
show images and data
description:
General engineering, co-ordination and site supervision for the erection of a testing center for massive multi-stage compressors (strings), driven by gas or steam turbines. Main structure is a steel hangar of 40 x 35 x 180 m size equipped with three overhead crane levels designed for loads between 10 t and 350 t6 (tandem processing 700 t). Additional structures, 3 steelwork pipe bridges up to 1,200 m in length, a cooling tower, several electrical buildings with cable ducts, transformer bays and a three-story staff facilities and main control building are being erected. Road access to Rhine Port and adjacent production plant are being constructed to enable access by heavy load vehicles depending on test rig setup..  

services:
Project management, co-ordination and general engineering, detailed architectural and structural engineering, civil works
specification and contracting, permit
management, entire execution planning,
co-ordination of specialist engineering during the respective phases,
general construction management and specialist site supervision,
supervision of commissioning.



State Hospital Freistadt

area:
Architecture and Planning , Structural Engineering
place:
Freistadt, Austria
customer:
Oberösterreichische Gesundheits- und Spitals-AG (GESPAG)
period of time:
2004 - 2007
project costs:
€ 18 million
show images and data
description:
The State hospital Freistadt required more space and a reorganization of the existing structure. 
This requirements were satisfied by the construction of an additional storey on top of the existing building , the reconstruction within the existing building, and the construction of  5 annexes to the existing building and 3 multi-storey buildings.
These annexes were build with the option of a future extension by an additional storey in concrete structure.
All construction works were executed with the hospital in service.

services:
Complete Service Structural Design
Site management of the complete works


State Hospital Gmunden

area:
Architecture and Planning
place:
Gmunden, Austria
customer:
Oberöstereiche Gesundheits- und Spitals-AG (GESPAG)
period of time:
2007 - 2015
project costs:
€ 65 million
show images and data
description:
The existing hospital was extended in a north-east direction with a new building (Buildings C and D). An extension was planned on the north-west side with a roof mounted helipad.
The existing buildings B, G, and the entrance area were renovated or rebuilt. As part of the new construction a 2-storey underground car park was realized.
All measures were carried out under full hospital operation.
A special feature of the project was the lowering of the inner courtyard, which led to shifting of all the main media lines.
Another particularity is that 60% of the project is to be built in 30% of the total construction period.

services:
Owner’s representative
Schedule control
Quality control
Cost control
Implementation of Austrian codes
Award of contracts in individual trades


State Mental Hospital Wagner-Jauregg

area:
Architecture and Planning
place:
Linz, Austria
customer:
Oberösterreichische Gesundheits- und Spitals-AG (GESPAG)
period of time:
1996 - 2004
project costs:
€ 205 million
show images and data
description:
The State Mental Hospital Wagner-Jauregg is a new development
with various components:
BT B - Ambulance                       BT C - Somatic,            
BT D - Psychiatry                         BT E - Supply
BT F - Civil Protection Area          BT G - Acute Ward
BT K - Operating Theater            BT L - Administration (rebuilt)
BT S - Training Center                 BT V1 and V2 – Technical Buildings

Total development: 596 beds (243 in the historical building and 353 in the
                                new building)

Construction volume:    ~ 300,000 m3
Gross floor area:           ~   70,000 m2

services:
Construction Management
Site supervision for:
Superstructure
Rebuilding and modification
Internal finishes
External facilities
Temporary buildings

Planning and site coordination



TANESCO, Construction of 60MW Heavy Fuel Oil Fired Power Station in Mwanza, Tanzania

area:
Architecture and Planning
place:
Mwanza, Tansania
customer:
TANESCO, Tanzania Electrical Supply Co.
period of time:
2011 - 2013
project costs:
€ 1.2 million
show images and data
description:

With construction of this plant, by supporting supra-regional supply an important step is taken to upgrade power supplies in the Victoria Lake Zone. The main purchasers of the generated power are consumers in the City of Mwanza with a population of 1.2 million and numerous mining companies in the immediate vicinity.
services:
Participation in determining basic data and constraints, conceptual design, tendering with contract award, contract negotiations, reviews with approval of plans, overseeing on site of the entire construction phase as "Owner's Engineer" of civil, mechanical, I&C and electrical engineering services
QA/ QC management, checks of service performance
Acceptance of services
Time scheduling
Chairing and taking minutes of routine meetings
Overseeing guaranteed performance tests upon project completion

Techno-Economic Consultancy Services on the Erongo Coal Power Station Project, Namibia

area:
Infrastructure and Transportation
place:
, Namibia
customer:
NamPower
period of time:
2011 - 2013
project costs:
€ 700 million
show images and data
description:
The establishing of a coal fired power station in the Erongo region has been identified as part of NamPower’s security of supply plan. NamPower intends to develop a 200 - 300 MW coal fired power
station and has requested Fichtner Bauconsulting GmbH to provide services that include the confirmation of the technical description of the Project, determination of the size of the plant, determination of coal sources, quantities and specifications, risk analysis, cost estimates for the Project and associated infrastructure options, cost estimates of operating and fuel cost, modelling, inputs only into NamPower’s transmission integration studies and the compilation of design basis and technical specifications. It also includes a shunting yard with loading station at the harbour,
120 km track and a shunting yard, sidings and unloading facilities on site.
services:
Project engineering for transportation facilities
(roads and railroad tracks)

THALES Navigation Aid Systems Projekt (SNC10), Oman

area:
Airports
place:
Haima, Oman
customer:
THALES Air Systems
period of time:
2011 - 2013
project costs:
k.A.
show images and data
description:
In connection with setting up its navigational installations for the Navigation Aid Systems Project (SNC 10) in Oman, THALES Air Systems must prepare method statements for the plant components and installation steps. The complete project encompasses equipping six airports plus one site for en route navigation.
Depending on location, ILS and DVOR/DME are installed.
services:
Preparing method statements for the new DVOR/DME at the Haima en route navigation location, 
with the following components: 
equipment transportation
dismantling and reuse of parts of the existing CVOR
counterweight, lightning protection, antennas
protection container with fittings
near-field monitor
fire alarm
remote control system
clearance of site

Waste Water Treatment Plant Fraport

area:
Infrastructure and Transportation , Structural Engineering
place:
Frankfurt Airport, Germany
customer:
Fraport / Hochtief AG
period of time:
2010 - 2012
project costs:
€ 7.8 million
show images and data
description:
For the treatment and cleaning of waste water coming from the apron, a new treatment plant  at the international airport Frankfurt was planned. The planning includes structures for multi-level cleansing, sedimentation and collection as well as several storage tanks for concentrated frost protection agent.
The tanks with a diameter of 25,30m and a height of 23,40m  were built in post-prestressed concrete with a wall thickness of 35cm .
The different collection and sedimentation basins were built in reinforced concrete. The pump-house and the operations building were built in a combination of reinforced concrete and steel structures.
services:
Complete design and structural calculation for the buildings, support for site supervision and construction management.


Weig-Karton (cardboard manufacturers) power plant: steam turbine change-out and new build, Mayen

area:
Architecture and Planning
place:
Mayen, Germany
customer:
Moritz J. Weig GmbH & Co. KG
period of time:
2010 - 2013
project costs:
€ 8.5 million
show images and data
description:

Weig-Karton operates a modern power plant for cogeneration of electricity and steam with recovery of thermal energy from production residues. In the interests of an economical heat supply, the municipality of Mayen is supplied with production waste heat and heat extracted from the power plant. For power plant rehabilitation, steam turbine No. 1 is dismantled with a new steam turbine No. 3 erected and tied into the existing plant. For live steam supply, IP and LP steam reducing stations are erected in the steam turbine No.2 building. All services are executed in the existing inventory while it is operating, without interrupting power and steam supply. The principal civil measure is construction of a new turbine deck with foundations and fitting out work.
services:
Determination of basic data and constraints; pre-project planning; conceptual engineering; preparation of permit application; detail engineering; preparation for contract award; assistance during contract award 
Collecting data on present inventory and operations
Investigation of layout options
Layout design, facilities planning, time scheduling and cost planning
Concept and plans for installing a new steam turbine in the existing facilities
Civil and technical plant specifications
Functional tendering for a general civil and plant contractor
Technical and commercial bid evaluation
Contract negotiations, with contract award recommendation

Windfarm Project Mesihovina, Bosnia and Herzegovina

area:
Infrastructure and Transportation
place:
Mesihovina, Bosnia and Herzegovina
customer:
Elektroprivreda, Fichtner GmbH
period of time:
2011 - 2016
project costs:
€ 80 million
show images and data
description:
For a wind farm with a planned rating of 44 MW, comprising 22 wind turbines with controls and cabling as well as civil infrastructure, grid tie-in, turbine assembly areas etc., Fichtner Bauconsulting acts as implementation consultant during engineering, tendering and contract award, and assists throughout project execution, including site supervision.
services:
Consultant
Infrastructure planning
Site supervision

`Smart Campus’ of the Wiener Netze distribution utility

area:
Architecture and Planning
place:
Vienna, Austria
customer:
Wiener Netze
period of time:
2013 - 2016
project costs:
€ 140 million
show images and data
description:
The Wiener Netze power and natural gas distribution network operator is erecting a new company headquarters, the 'Smart Campus', in the 11th Viennese District. Throughout all phases, from planning through construction up to operation, ecological criteria are to be met.
The main ‘Smart Campus’ premises are planned as an interlinked building complex for the sole use of the utility.
Building levels are assigned to the company activities of operation, support and administration.
The operating functions with storage and workshop facilities are brought together in a two-story ‘plinth’ while the administration as a standard-setting campus is located on the greened roofs of the workshops.
The quintessential functional and design feature is the linear infrastructural and communications axis. This east-west spine is the principal axis to which all services functions of the building complex are connected. Generously dimensioned air spaces ensure natural lighting of the entire internal access and core zones, promote staff communication and offer, thanks to their linear configuration, optimal orientation,
The building consists of a basement, ground floor, four upper stories and the top story with roof.
At scattered locations, areas are constructed with lifting equipment beneath the floor plates.
The escape level of the fourth upper story at 15.48 m is below 22 m, so the construction project is not subject to the Austrian regulations on fire protection in high-rise buildings.
The building accommodates the primary administrative support center for the Viennese energy power network utility, Wien Energie Stromnetz GmbH, but also contains units with operative functions.
In total, up to 1400 staff, including all organizational reserves, will be employed within the Smart Campus. Added to this are a maximum of 300 people present temporarily when events are staged. 
The buildings are located on the site of a former coking plant for gas manufacture so the entire soil material is contaminated. This soil is transported away by rail, so relieving the urban traffic load.
To the Wiener Netze WEBCAM  and some videos .

services:
General site management
Civil site Management